

Cylinder with deck machined, valves and 80" piston
installed.

Cylinder after precision sleeving job. Note the fine deck
surface finish



Cluster "Roller" bearing and thrust washer upgrade using
Kiwi engineered gears. Roller bearings take 40% increase loads over others
needle bearings

Transmission foot being reclaimed

Arbor press with a new Kiwi crankcase set upon pressing fixture to properly align bushings, shafts and housings.
Existing head bolt washer face mushed out from years of
service.

This pic is of a partial cut showing the extent of the
cupping (approx .020 to fully clean it up)

milling head bolt washer faces flat.

The finished machined product

Rockwell hardness tester. This enables to check the surface hardness of every heat treated part to ensure its quality


Valve grinding

Sunnen CK 10 power hone

Honing cylinders

Torque plate fixture for bolting Chief and Scout
cylinders to in order to simulate distortion when it is fitted to the cases.

Machining cylinder head gasket face. We remove the absolute minimum amount of original material as possible.